Baosteel Zhanjiang No.1 BF Blown-In
The No.1 BF at Zhanjiang Steel Plant was designed by CISDI with a volume of 5,050m3, an expected campaign of 22 years and an annual hot metal production of 4.115Mt/a.
The No.1 BF at Zhanjiang Steel Plant was designed by CISDI with a volume of 5,050m3, an expected campaign of 22 years and an annual hot metal production of 4.115Mt/a.